Make Up Work Day This Sunday

Wali came and went without disturbing Niumalu very much. It did, however, disturb our mangrove clearing work schedule, and we really need to make up for that.  If you can spare the time, please kokua.  We will be working the Mālama Hulē‘ia project site from 8:30 AM to noon.  Then we break for lunch and a Steering Committee meeting.

There will be a low tide Sunday morning, so the land should be dryer than it was last Sunday, when the ‘alae‘ula and cattle egrets had the place for themselves:

7-20-14

7-20-14

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s